Monthly Production Report for April 2021

Monthly Production Report for April 2021

 Ministry of Petroleum & Natural Gas

Monthly Production Report for April, 2021

प्रविष्टि तिथि: 21 MAY 2021 12:12PM by PIB Delhi

Production of Crude Oil

Crude oil production[1] during April, 2021 was 2493.26 TMT which is1.16%higher than target but2.07% lowerthan the production during April, 2020. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of April, 2021 vis-à-vis same period of last year are shown in Table-1 and month-wise in Figure-1.

Table-1: Crude Oil Production (in TMT)

Oil Company

Target

April (Month)

2021-22 (Apr-Mar)

2021-22

2020-21

% over last year

Target

Prod.*

Prod.

ONGC

20272.88

1607.43

1636.57

1681.77

97.31

OIL

3182.60

245.86

242.74

248.25

97.78

PSC Fields

7718.52

611.29

613.95

615.83

99.69

Total

31173.99

2464.58

2493.26

2545.85

97.93


Note: 1. Target for the year 2021-22 is provisional, subject to finalization.     *: Provisional

Totals may not tally due to rounding off.

Figure-1: Monthly Crude Oil Production

Monthly Crude Oil Production

Unit-wise production details with reasons for shortfall are as under:

  • Crude oil production by ONGC(Oil and Natural Gas Corporation) in nomination block during April, 2021 was 1636.57TMT which is 1.81%higher than the target but2.69%lowerthan the production during April, 2020.
  • Crude oil production by OIL(Oil India Ltd) in the nomination block during April, 2021 was242.74 TMT which is1.27% lower than target but 2.22% lower than the production during April, 2020.Reasons for shortfall in production are as under:

Less than planned contribution from workover wells, drilling wells and old wells.

Bandhs /blockade by local people and associations after the Baghjan Blowout.

  • Crude oil production by Pvt/JVscompanies in the PSC (Production Sharing Contract) regime during April, 2021 was 613.95 TMT which is marginally higher than the target by 0.43% but0.31% lower than the production during April, 2020. Reasons for shortfall in production are as under:

RJ-ON-90/1 (Cairn Energy India Ltd): A few wells under Electrical Submersible Pump maintenance and lower Polymer Injection in Mangala field. Gas handling issues, Pump failureand hook up delay of wells in ABH field. Flow cease in few wells of Satellite fields.

CB-ONN-2004/2 (ONGC): A few wells under activation/observation.

CB-ONN-2000/1 (GSPC): Commencement of commercial production from Balpurafield is delayed due to ongoing COVID-19 pandemic. Few wells not producing due to possible casing damage, snapped/unscrewed sucker rod string and unavailability of effective demulsifier.

BAKROL (SELAN): Few wells under Workover operation.

Production of Natural Gas

Natural gas production during April,2021 was 2651.49MMSCM which is 22.68% higher than the production during April, 2020 but lower by 1.02% than the monthly target. Unit-wise and state-wise natural gas production are given at Annexure-II. Unit-wise natural gas production for the month of April, 2021 and same period of last year are shown in Table-2 and month-wise in Figure-2.

Table-2: Natural Gas Production (in MMSCM)

Oil Company

Target

April (Month)

2021-22 (Apr-Mar)

2021-22

2020-21

% over last year

Target

Prod.*

Prod.

ONGC

23335.10

1805.25

1725.50

1725.69

99.99

OIL

2949.65

239.54

215.13

202.05

106.47

PSC Fields

11834.60

634.13

710.86

233.59

304.33

Total

38119.35

2678.92

2651.49

2161.32

122.68

Note: 1. Target for the year 2021-22 is provisional, subject to finalization.     *: Provisional
          2. Totals may not tally due to rounding off.

Natural gas production by ONGC in the nomination blocks during April, 2021 was 1725.50MMSCM which is 4.42% lower than the target and 0.01%lowerthan the production during April, 2020. Reasons for shortfall in production are as under:

  • Less than planned production from Vasistha/S1 wells due to reservoir related issues.
  • Delay in commencement of gas production from U1 field of KG-98/2 Cluster-II due to COVID-19 impact as manufacturing of subsea items and well completion got delayed.
  • Evacuation constraint in 36” BPA-Hazira Gas Pipeline.

Natural gas production by OILin the nomination block during April, 2021 was 215.13 MMSCM which is 6.47% higher than the production during April, 2020 but lower by 10.19% than the monthly target. Reasons for shortfall in production are as under:

  • Low upliftment/demand of gas by the major customers.
  • Bandhs /blockade by local people and associations after the Baghjan Blowout.

Natural gas production by Pvt/JVs companiesin the PSC& CB Mregime during April,2021 was 710.86MMSCM which is 12.10% higher than the target and 204.33% higher than the production during April, 2020.

Crude Oil Processed (Crude Throughput)

Crude Oil Processed during April, 2021 was 19884.70 TMT which is 1.82% higher than the target for the month and 34.86% higher vis-à-vis April, 2020.Capacity utilization during the April, 2021 was 96.82%. Refinery-wise details of the crude throughput and capacity utilization during the month of April, 2021 vis-à-vis April, 2020 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of April, 2021vis-à-vis same period of last year are shown in Table-3 and month-wise in Figure-3.

Table 3: Crude Oil Processed (Crude Throughput) (in TMT)

Oil Company

Target

April (Month)

2021-22 (Apr-Mar)

2021-22

2020-21

% over last year

Target

Prod.*

Prod.

CPSE

145812.84

11262.72

11524.50

7103.76

162.23

IOCL

70299.81

6052.10

5980.31

3046.13

196.32

BPCL

30499.94

2610.00

2588.73

1583.76

163.45

HPCL

17199.69

840.31

867.43

1323.97

65.52

CPCL

10000.00

500.00

759.79

307.60

247.00

NRL

2750.35

154.95

221.22

169.73

130.33

MRPL

15000.00

1100.00

1099.79

670.65

163.99

ONGC

63.04

5.36

7.23

1.92

376.90

JVs

18021.00

1551.00

1706.44

925.13

184.45

BORL

7000.00

645.00

647.54

332.28

194.87

HMEL

11021.00

906.00

1058.90

592.85

178.61

Private

78008.07

6716.28

6653.77

6716.28

99.07

RIL

60940.96

5314.49

5020.99

5314.49

94.48

NEL

17067.11

1401.79

1632.78

1401.79

116.48

TOTAL

241841.91

19529.99

19884.70

14745.18

134.86

Note: 1. Target for the year 2021-22 is provisional, subject to finalization.     *: Provisional


2. Totals may not tally due to rounding off.

Figure 3: Crude Oil Processed (Crude Throughput)

Crude Oil Processed (Crude Throughput)

3.1 CPSE Refineries’ crude oil processed during April, 2021 was 11524.50TMT which is 2.32% higher than the target for the month and62.23% higher than that of April, 2020.

3.2       JV refineries’ crude oil processed during April, 2021 was 1706.44TMT which is 10.02% higher than the target for the month and84.45% higher than that of April, 2020.

3.3       Private refineries’ crude oil processed during April, 2021 was 6653.77TMT which is 0.93% lower than that of the corresponding month of last year.

Production of Petroleum Products

Production of Petroleum Products during April, 2021 was 20891.57 TMT which is 1.04% higher than the target for the month and 30.90% higher than the production during April, 2020. Refinery-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of April, 2021 vis-à-vis same period of last year are shown in Table-4 and month-wise in Figure-4.

Table 4: Production of Petroleum Products (TMT)

Oil Company

Target

April (Month)

2021-22 (Apr-Mar)

2021-22

2020-21

% over last year

Target

Prod.*

Prod.

CPSE

137873.44

10691.68

10989.44

6621.07

165.98

IOCL

66984.33

5789.90

5795.76

2888.78

200.63

BPCL

29279.04

2505.99

2547.61

1480.85

172.04

HPCL

16019.55

779.19

807.56

1268.87

63.64

CPCL

9279.11

457.22

611.19

247.97

246.48

NRL

2749.06

154.88

219.63

171.74

127.88

MRPL

13502.33

999.40

1000.96

560.99

178.43

ONGC

60.02

5.10

6.74

1.87

360.39

JVs

16361.00

1420.00

1611.16

826.14

195.02

BORL

6095.00

562.00

577.44

231.70

249.22

HMEL

10266.00

858.00

1033.73

594.44

173.90

Private

93222.97

8216.52

7925.08

8216.52

96.45

RIL

76683.16

6768.99

6374.66

6768.99

94.17

NEL

16539.81

1447.54

1550.42

1447.54

107.11

Total Refinery

247457.41

20328.20

20525.69

15663.73

131.04

Fractionators

4516.39

348.19

365.89

296.08

123.58

TOTAL

251973.80

20676.39

20891.57

15959.81

130.90


Note: 1. Target for the year 2021-22 is provisional, subject to finalization.     *: Provisional

          2. Totals may not tally due to rounding off.

Figure 4: Monthly Refinery Production of Petroleum Products: 

Monthly Refinery Production of Petroleum Products

Production of petroleum Products by Oil’s Refineries during April, 2021 was 20525.69 TMT which is 0.97% higher than the target for the month and 31.04% higher than the production during April, 2020.

Production of petroleum Products by Fractionators during April, 2021 was 365.89 TMT which is 5.08% higher than the target for the month and23.58% higher than the production during April, 2020.

Please Click here to See Annexure

Source: PIB

नोट :- हमारे वेबसाइट www.indiangovtscheme.com पर ऐसी जानकारी रोजाना आती रहती है, तो आप ऐसी ही सरकारी योजनाओं की जानकारी पाने के लिए हमारे वेबसाइट www.indiangovtscheme.com से जुड़े रहे। 
*****
Share via
Copy link