GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS

LOK SABHA

UNSTARRED QUESTION NO. 3720
TO BE ANSWERED ON 18.12.2024

NUMBER OF VACANT POSITIONS IN RAILWAYS

SHRI KARTI P CHIDAMBARAM:
SHRI ABHISHEK BANERJEE:

Will the Minister of RAILWAYS be pleased to state:

(a) the total number of vacant positions within Indian Railways, particularly in critical areas such as station management, safety operations and train security;

(b) the specific measures being taken to address this issue along with timeline for filling these vacancies, especially in high-priority areas like major stations and on busy, high-traffic train routes; and

number_of_vacant_positions_in_railways

(c) the total number of vacancies for the post of loco-pilots and assistant loco-pilots in Indian Railways?

ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY

(SHRI ASHWINI VAISHNAW)

(a) to (c) : Occurrence and filling up of vacancies are continuous processes on Indian Railways considering its size, spatial distribution and criticality of operation. Adequate and suitable manpower is provided to cater to the regular operations, changes in technology, mechanizations and innovative practices. The vacancies are filled up primarily by placement of indents by Railways with Recruitment agencies as per operational and technological requirements.

After easing of restrictions imposed on account of COVID 19, two major examinations involving more than 2.37 crore candidates have been conducted successfully.

Exam Candidates Cities Centres Days Shifts
L2 – L6 1.26 cr 211 726 68 133
L-1 1.1 cr 191 551 33 99

Based on these exams, 1,30,581 candidates have been recruited in railways.

The RRB examinations are quite technical in nature entailing large scale mobilization of men and resources and training of manpower. Railway overcame all these challenges and successfully conducted the recruitment in a transparent manner following all laid down guidelines. No instance of paper leakage or similar malpractice has occurred during the entire process.

Recruitment done in Indian Railways during 2004-2014 vis-à-vis during 2014-2024 is given as under:

Period Recruitments
2004-14 4.11 lakh
2014-24 5.02 lakh

Further, as system improvement, the Ministry of Railways has introduced a system of publishing annual calendar from 2024 for recruitment to various categories of Group ‘C’ posts. The introduction of annual calendar will benefit the aspirants in the following manner:

  • More opportunities for candidates;
  • Opportunities to those becoming eligible every year;
  • Certainty of exams;
  • Faster Recruitment process, Training and Appointments Accordingly, Eight Centralized Notifications (CENs) for 58,642 vacancies have been notified during January to October 2024 for filling up of posts of Assistant Loco Pilots, Technicians, Sub- Inspectors & Constables in Railway Protection Force (RPF), Junior Engineers/Depot Material Superintendents/Chemical & Metallurgical Assistants, Paramedical Categories, Non-Technical Popular Categories (Graduates) & Non-Technical Popular Categories (Under- Graduates). This includes 18,799 vacancies of Assistant Loco Pilots. The Computer Based Test has commenced from 25.11.2024 onwards.

Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents. Consequential Train Accidents have reduced from 135 in 2014-15 to 40 in 2023-24 as shown in the graph below. The causes of these accidents broadly include track defects, loco/coach defects, equipment failures, human errors etc.

It may be noted that the consequential train accidents during the period 2004-14 was 1711 (average 171 per annum), which has declined to 678 during the period 2014-24 (average 68 per annum), i.e. reduction of 60 % Another important index showing improved safety in train operations is Accidents Per Million Train Kilometer (APMTKM) which has reduced from 0.11 in 2014-15 to 0.03 in 2023-24, indicating an improvement of approx. 73% during the said period.

Consequential Train Accidents on Indian Railways and casualties therein:

Period

No.  of Consequential Train Accidents

No. of Deaths No. of Injuries
2004-05 to 2013-14 1711 904 3155
2014-15 to 2023-24 678 748 2087

The various safety measures taken to enhance safety in train operations are as under: –

1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under :

Expenditure on Safety related activities (Rs. in Cr.)
   2022-23(Act) 2023-24(Act) BE 2024- 25
Maintenance  of  Permanent  Way & Works 18,115 20,322 21,386
Maintenance     of   Motive Power and Rolling Stock 27,086 30,864 31,494
Maintenance of Machines 9,828 10,772 11,864
Road Safety LCs and ROBs/ RUBs 5,347 6,662 9,980
Track Renewals 16,326 17,850 17,652
Bridge Works 1,050 1,907 2,137
Signal & Telecom Works 2,456 3,751 4,647
Workshops  Incl.  PUs  and  Misc.

expenditure on Safety

7,119 9,523 9,615
Total 87,327 1,01,651 1,08,776

2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,608 stations up to 31.10.2024 to eliminate accident due to human failure.

3. Interlocking of Level Crossing (LC) Gates has been provided at 11,053 level Crossing Gates up to 31.10.2024 for enhancing safety at LC gates.

4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,619 stations up to 31.10.2024.

5. Kavach is a highly technology intensive system, which requires safety certification of highest order. Kavach was adopted as a National ATP system in July 2020. Kavach is provided progressively in phased manner. Kavach has already been deployed on 1548 RKm on South Central Railway and North Central Railway. Presently, the work is in progress on Delhi- Mumbai and Delhi-Howrah corridors (approximately 3000 Route Km). Track side works on these routes have been completed on about 1081 RKm (705 RKm on Delhi-Mumbai section and 376 RKm on Delhi-Howrah section). Regular trials are being done on these sections.

6. Detailed instructions on issues related with safety of Signalling e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued.

7. System of disconnection and reconnection for S&T equipment as per protocol has been re-emphasized.

8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots.

9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather.

10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates etc.

11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals.

12. Mechanization of track laying activity through use of track machines like PQRS, TRT, T-28 etc to reduce human errors.

13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety.

14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails.

15. Laying of longer rails, minimizing the use of Alumino-Thermic Welding and adoption of better welding technology for rails i.e. Flash Butt Welding.

16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars).

17. Patrolling of railway tracks to look out for weld/rail fractures.

18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works.

19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices.

20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs.

21. Detailed instructions on issues related with safety of Track e.g. integrated block, corridor block, worksite safety, monsoon precautions etc. have been issued.

22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations.

23. Replacement of conventional ICF design coaches with LHB design coaches is being done.

24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019.

25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections.

26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc.

27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner.

28. Regular counselling and training of staff is undertaken.

29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/ replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan.

The details of the Safety related works undertaken by Railways are tabulated below: –

 

SN

 

Item

2004-05 to

2013-14

2014-15 to 2023-

24

2014-24

Vs.

2004-14

  Track Maintenance
1. Expenditure                                  on

Track  Renewal  (Rs. in Cr.)

47,038 1,09,577 2.33

times

2. Rail                      Renewal

Primary (Track Km)

32,260 43,335 1.34

times

3. Use   of   high-quality

rails (60 Kg) (Km)

57,450 1,23,717 2.15

times

4. Longer    Rail                Panels

(260m) (Km)

9,917 68,233 6.88

times

5. USFD   (Ultra   Sonic

Flaw               detection) Testing of Rails (Track km)

20,19,630 26,52,291 1.31

times

6. USFD   (Ultra   Sonic

Flaw               detection) Testing of Welds (Nos.)

79,43,940 1,73,06,046 2.17

times

7. Weld failures (Nos.) In 2013-14:

3699

In 2023-24: 481 87%

reduction

8. Rail fractures (Nos.) In 2013-14:

2548

In 2023-24: 383 85%

reduction

9. Thick Web Switches

(Nos.)

Nil 21,127  
10. Track                     Machines

(Nos.)

As on

31.03.14 = 748

As on 31.03.24 =

1,661

122%

increase

  Level Crossing Gate Elimination
1. Elimination of As on As on 31.03.24: 100%
Unmanned Level 31.03.14: Nil reduction
Crossing Gates 8948 (All eliminated
(Nos.)   by 31.01.19)
2. Elimination Manned Crossing (Nos.) of Level Gates 1,137 7,075 6.21

Times

3. Road   over   Bridges (RoBs)/ Road under Bridges  (RUBs) (Nos.) 4,148 11,945 2.88

Times

4. Expenditure     on    LC Elimination (LC+ROB+RUB) 8,825 41,957 4.75

Times

  Bridge Rehabilitation
1.

Expenditure             on Bridge Rehabilitation     (Rs. in Cr.)

3,924 8,255 2.10

Times

  Signalling Works
1. Electronic Interlocking (Stations) 837 2,964 3.52

times

2. Automatic         Block Signaling (Km) 1,486 2,497 1.67

times

3. Fog      Pass      Safety As on As on 31.03.24: 219
Devices (Nos.) 31.03.14: 19,742 times
90

SN

Item Rolling Stock 2004-05 to 2013-14 2014-15 to 2023-24 2014-24 Vs. 2004-14
   
1. Manufacture Coaches (Nos.) of LHB 2,337 36,933 15.80 times
2. Provision of Fire and Smoke Detection    System    in  AC coaches (Nos. of Coaches) 0 19,271  
 

3.

Provision of Fire Detection and Suppression System in Pantry and Power Cars (Nos. of Coaches)  

0

 

2,991

 
4. Provision             of                             Fire Extinguishers in    Non–AC coaches (Nos. of Coaches) 0 66,840